Injection Molding Cost Calculator
Estimate the per-part manufacturing cost of a plastic injection-molded part: material, machine time and mold amortization. Built for buyers and engineers who need to judge whether a supplier's quotation is reasonable.
Shot weight — g · Estimated cycle — s
Accuracy: ±25%. Material prices are market references, cycle time is an empirical estimate, and secondary operations (painting, printing, assembly), packaging, freight, overhead and margin are not included. Treat the result as a sanity check on a quotation, not as a substitute for one.
How the estimate is built
Three components drive almost all of the unit cost of an injection-molded part:
- Material — the shot weight, including runner and sprue, divided by cavities, grossed up for the scrap rate.
- Machine time — the molding cycle multiplied by the hourly machine rate, divided by cavities. Cycle time grows with the square of wall thickness, which is why a part that is 1 mm thicker can cost far more than its extra material would suggest.
- Mold amortization — mold cost spread over whichever is smaller: the total parts the mold can produce in its lifetime, or the parts you will actually make during the amortization period. For low-volume parts the second one dominates, and it is the number most often left out of a supplier's quotation.
Formula
Using the notation below (all money in yuan):
shot_weight_g = volume_cm3 × cavities × density × (1 + runner_ratio)
material_per_part = shot_weight_g / 1000 × price_per_kg / cavities / (1 − scrap_rate)
cooling_s = 1.6 × wall_mm² × cooling_factor
cycle_s = cooling_s + 8
machine_per_part = cycle_s / 3600 × machine_rate / cavities
amort_base = min(mold_life_shots × cavities, monthly_volume × amortization_months)
mold_per_part = mold_cost / amort_base
total_per_part = material + machine + mold_amortization Inputs explained
| Input | What it means | Typical range |
|---|---|---|
| Part volume | Actual plastic volume of the part, excluding runners | 1–500 cm³ |
| Wall thickness | Average wall; drives cooling time quadratically | 1.0–4.0 mm |
| Cavities | Parts produced per shot | 1–64 |
| Machine rate | Hourly cost of the press, labour included or not | ¥40–120/hour |
| Scrap rate | Share of parts rejected; increases material use | 1–10 % |
| Mold cost | Total tooling cost | ¥30k–500k |
| Mold life | Shots before the tool needs repair | 100k–1M |
Worked example
A 100 cm³ ABS enclosure, 2 mm wall, one cavity, 60 ¥/hour machine, 3 % scrap, a ¥200,000 mold with a 500,000-shot life, 5 % runner, 50,000 parts per month over 24 months:
| Shot weight | 109.2 g |
| Material | ¥1.46 |
| Machine time (14.4 s cycle) | ¥0.24 |
| Mold amortization | ¥0.40 |
| Total | ¥2.10 per part |
Drop the volume to 1,000 parts per month and the mold term becomes ¥16.67 per part — the same part, seven times the cost. Volume, not geometry, is usually what makes small orders expensive.
What this does not include
- Secondary operations: painting, printing, plating, ultrasonic welding, assembly
- Packaging, cartons, pallets
- Freight, duties, insurance
- Factory overhead, management fee, supplier margin
- Mold design, trial runs and engineering changes
FAQ
Why is my supplier's quote higher than this estimate?
Usually one of four reasons: smaller volume than you entered, a more expensive mold than assumed, secondary operations, or simply margin. Compare the three components separately rather than the total — a material gap suggests a price difference, a machine-time gap suggests a slower cycle or a bigger press than needed.
How accurate is the cycle time?
It is a first-order estimate from wall thickness. Real cycles depend on cooling channel design, gate location, material flow and ejector setup, and can differ by ±30 %. Use it to compare designs, not to schedule a press.
Should mold cost be amortized over the mold life or over my order?
For a long-running product, over the mold life. For a limited run, over the order quantity (or a 12–24 month horizon) — otherwise the mold appears almost free per part while you are still paying for it. That is what the amortization period input does here.
Does this work for other processes?
No. The model is specific to thermoplastic injection molding. Die casting, stamping and CNC have different cost structures and will get their own calculators.
Seeing sink marks, flash or warpage in sampling or production? Start with the injection molding defect checklist to tell a two-hour setup change from a mold rework or a design change.
Machine tonnage is a number too: the clamp force and tonnage calculator picks the smallest press that covers the projected area and cavity pressure, and the machine hour rate calculator turns that size into an hourly cost — which is how much the extra size costs you over a year.