Surface treatment is priced per square decimetre and usually carries a per-batch minimum. This shows both: the per-part cost, and whether the minimum charge is what you are actually paying for.
Batch total ¥—
Accuracy: ±30%. Plating shops price by area but bill by lot; the minimum charge and jigging labour often decide the price more than the chemistry does.
Why area alone does not determine the price
- Area sets the chemistry consumption. Doubling area roughly doubles the chemical cost — but that is often the smaller half.
- Jigging and handling is per part regardless of size. A 20 cm² bracket and a 400 cm² panel can take the same minute to hang on a rack.
- Batch minimum is a fixed per-lot charge. Ten parts of a small item often cost the same as a hundred, because the shop has to run the line anyway.
- Masking — threads, bores and mating faces that must stay bare are hand-taped. Three minutes of masking can exceed the chemistry cost of the whole part.
Formula
dm2 = area_cm2 / 100
material = dm2 × price_per_dm2 / yield
minutes/part = handling + masking + setup_per_batch / batch
labour = minutes/part / 60 × labour_rate / yield
subtotal = material + labour + special
min_per_part = ceil(batch_minimum / batch)
total = max(subtotal, min_per_part) Worked example
Aluminium bracket, 200 cm² total surface, batch of 100, anodizing:
| Chemistry: 2 dm² × ¥12 = ¥24.00 | ¥24.00 |
| After 95% yield | ¥25.26 |
| Jigging 1.5 min + 15 min/100 shared | ¥1.16 |
| Batch minimum ¥200 ÷ 100 = ¥2.00/part | not binding |
| Per part | ¥26.42 |
| Batch total | ¥2,642 |
Now run the same part at 10 pieces: the per-part price rises to about ¥27 because the 15-minute jig setup is shared by ten parts instead of a hundred. Drop the part to 50 cm² at 10 pieces and the minimum charge takes over: you pay ¥20/part even though the area cost is only ¥8.43.
What this does not include
- Pre-treatment such as polishing, sandblasting or degreasing as a separate step
- Colour matching, samples and approval runs
- Thickness or salt-spray testing and certificates
- Packaging, freight and scrap of rejected parts beyond the yield figure
- Profit margin
FAQ
Why is my 20-part order so expensive per piece?
Two compounding effects: the per-batch minimum is spread over 20 parts instead of 200, and the jig setup time is shared by 20. Both are fixed costs that do not shrink with order size. If the part allows it, ordering 100 and storing them is usually much cheaper than ordering 20 twice.
Should I compare anodizing with powder coating?
Anodizing is a surface conversion on aluminium — it cannot chip, and it keeps dimensional tolerances tight. Powder coating is thicker, available in any colour, and works on steel. For aluminium housings with tight fits, anodizing usually wins; for steel frames and colour variety, powder wins.
How do I estimate surface area?
Add every exposed face: outer faces, inner walls, and the walls of holes and slots. A part measuring 50 × 30 × 20 mm has roughly 62 cm² of outer area, and internal features can add another 20–50%. Underestimating area is the most common source of a low estimate.